Monday, November 28, 2011

It's beginning to look a lot like Christmas

Upstairs hall primed
As the holidays approach, (and I must say, they're coming faster than I'm ready for) we're trying to increase speed in our productivity in hopes of completing the house by Christmas. Fred thinks we can finish and be moved in by Christmas... I'm more realistic and think it'll be at least mid-January. I hope he proves me wrong.
Small guest room primed

Fireplace scraped. How may colors do you see?
We're almost done with the upstairs. The smaller guest room (the "nursery" for those who know the references. And no that is not a declaration of pregnancy, but what the room WILL be when we are blessed.) and the upstairs hall have been primed. The windows work and they have been primed as well. So, now we've moved on to the guest room. It's quite a large room and it has been our makeshift command center, so cleaning it out took some effort. But we got it cleared and I cleaned and papered it. We scraped and sanded and realized that some of the plaster is cracked and is coming off. So Fred started peeling it off and half the plaster on the wall came down :-(. So now we need to replaster that section to be able to prime. Other than that, the guest room is ready to go! We also papered all downstairs and started on the living room. I scraped and scraped and scraped the paint off the bookshelves and baseboards. There's still a little bit left to scrape and then I can go crazy with the electric sander! We're getting closer. Three more rooms to go (the foyer, office and dining room).
Guest room before

Guestroom after cleaned
Hopefully, there won't be anymore hiccups and we'll be able to get things finished quickly. One of the issue we're contending with right now is the water heater. At first, we thought it wasn't working due to a very old timer hooked to the water heater line that turns it off for certain hours of the day.  It's a great product for those who don't want the water heater running all day using energy and from what I've seen they're fairly inexpensive. However, this one is old and needs to go.Turns out after bypassing it, that the timer is not the issue. So now we're trying to figure out if it's a bad breaker. Fred and his dad finally got the stove installed and now my kitchen is basically finished! (Some trim still needs to be installed).
Fred and his dad working on windows
Stove is in!

Fred counted the windows that still need to be opened and he has 1 left. He's proud of the fact that he's gotten the windows functioning after years of them being painted shut. There were layers and layers of paint. Not that we'll open them when we move in because we need screens (and screens don't look right on those kinds of windows) and Fred's allergies keep us from opening the windows as pollen circulates the whole house, which makes him miserable.... but I love the fresh air!

Medallion

"New" Chandelier
We were also given a gorgeous chandelier and plaster medallion that we'll be putting up in the dining room. Fred's brother and his wife gave it to us... it's from Smithfield Inn. They rescued it when the Inn renovated a couple of years ago. We're so excited because they are just so beautiful and will make the dining room look fantastic! the medallion needs a bit of repair work, but other than a few places, it is in unbelievable shape. We're so blessed to have received such wonderful pieces.
 
So the holidays are around the corner and we're busting butt to finish. I'm hoping everything is primed before Christmas. I keep hoping that Santa's elves will pop up and finish the house for us.... until then we'll keep the Christmas music blaring and the scrapers and sanders going.
 

Friday, November 4, 2011

Hurray for small victories!

Working on getting the Master sanded
We've gotten a few issues resolved... the refrigerator seems to be working now that Fred and his dad leveled it. Who knew!?! The gutters are also up, which has helped a lot with the water issue in the basement and the short when it rains. When it rained last Friday, the gutters kept water out, so when we got to the house Saturday the basement light worked! Hurray for small victories!

Door/trim in Master down to bare wood
Last weekend, we had the help of Fred's brother and his wife. Fred's brother was a huge help in that he finished priming the back stairwell that we had been neglecting mostly because it would be a huge pain in the rear to do. But he got it primed with no issues! He also went through the house and fixed the numerous cracks in the walls from settling. His wife and I worked hard on scraping doors and trim in the Master. We managed to get the trim scraped and sanded to start priming. And, we finally got the Master bedroom primed this weekend! One bedroom down, three to go!

We're now starting to work on the smaller bedroom and hallway. We worked this weekend on scraping the trim, door frames, and windows in hopes of getting both rooms primed this coming weekend. I also started working with the belt sander on some of the flat trim and once I got the feel of it, it was awesome!

The Master primed
Starting to use the belt sander
Fred's dad spent most of the day fighting with the new light fixture for the back stairwell. It's a pain when dealing with an older home that it is not to today's "standard size." So, after several trips to the hardware store to get the screws he needed (yes, the fixture came with screws but they weren't long enough to get it to stay in place on the ceiling, so we had to get longer ones) he finally got it in place. And it looks great! It's as close to something that would look original to the house as we could find. It's similar to the fixtures that are original and still in the house.

We stopped by the house last week to check on things and found that the electrician had been back to work on some of the issues. He was also wonderful and installed the microwave (it's an over the range microwave). It looks great! The only thing left to install is the stove. Fred is antsy to get it in and thinks he can install it. I told him to let the contractor do it, since I'm sure he's done it before and I know Fred hasn't. But the kitchen is getting closer and closer. I know I say that every time, but now there's only a couple of things left to do. We finally got the kitchen cleaned up today of boxes and other random items and it looks so much bigger!

So it's been a productive couple of weekends but we still have a lot to do. I'm hoping we can get the upstairs knocked-out soon. It's looking like we won't be in the house until closer to Christmas or maybe even after. I'm not happy about that, but I want the house ready before we move everything in because it would be a bigger pain to move furniture around to work in the rooms. Besides the floors need to be cleaned really well and a good waxing before any furniture goes on them. We may have to resort to begging for help, but so far we're moving right on a long. I just can't wait till we're done.

Saturday, October 22, 2011

We're still trucking....

What a crazy few weeks. We've had all sorts of things going on.... and so has the house.

The kitchen still isn't complete cause we're still waiting for the electrician to come finish his stuff. All that's left is getting the stove and disposal wired and hooked up. I can't wait until the stove isn't in the middle of the room anymore. Then it might look like a real kitchen! We got the refrigerator hooked up... but that is not without its own issue. So we went to the house on Sunday and opened to the door to a pool of water in the kitchen. Apparently, the plumber used one of the plastic water hookups for the ice maker and when the refrigerator was put in place the hose was kinked and the plastic cracked, sending water everywhere for three days! We got it cleaned up and tried to find the metal one we had bought when we order the appliances. Couldn't find it anywhere, so Fred went and bought a new one. We got that hooked up. One issue solved. Now the freezer had lots of water in it that froze up. We're thinking it's from the hook up but aren't sure. And now the refrigerator beeps saying the door isn't closed all the way when we know it is..... so we may have to get a repairman to fix the refrigerator, or return it. UGH!

We did manage to get the upstairs bathroom painted. We opted for yellow (Beeswax) and white. I like it a lot. Sunday, Fred's dad and I were hard at work painting, when he stepped off the ladder and into the yellow paint can..... it went EVERYWHERE! A nearly full can of yellow paint. Thankfully, we had a drop cloth down that got most of it. After trying to clean that up enough to move it, we got the drop cloth out and realized the yellow seeped through to the white tile floor! I've never run so fast in my life to get a wet towel. I grabbed the towels we had used to sop up the water in the kitchen (I knew they'd be handy) and started scrubbing the tile floor before the yellow paint dried. I managed to get it all up.... I blame myself really. I had made a comment about an hour prior that I didn't think we needed a whole gallon of yellow for the bathroom.... well, we didn't and managed to only get about a third of a gallon to use... but it was enough.

We got two of the upstairs bedrooms and the hallway papered to protect the floors, which is my number 1 priority. That took forever cause we needed to clean the floors and then tape the paper down, but it'll be worth it if it keeps the floors from being any more scratched up. I also got the bathroom door and shelves painted and they are ready to be put back. I'm very excited about the the bathroom door being reinstalled!

Fred opening window
Fred and his dad and a family friend worked hard on more windows and managed to get three of them open, top and bottom! Only 23 more to go. It's great, but an issue since we told the guys who painted the outside trim, that they needed to get the windows open before they painted. Well that didn't happen and they further painted the windows shut. So now that we've gotten some of the windows open, the outside trim needs to be touched up. It ticks me off that now there are more steps to be done. They should've just gotten the windows open like they were supposed to before painting... but I'm learning that it's hard to find good help. I'll let the contractor deal with them.They really don't want me to confront them.

I'm realizing that the deeper we get into the house, the more my stress level rises. We still have random electrical issues. The electrician seems to think that there's a short in one of the wires to the outside lights that when used triggers the breaker and shuts off the downstairs lights. So we taped off the switches to the outside lights until we can figure out where the short is. Well, that may not the the only issue. Fred went to the house after it rained the other day and the basement light tripped again. So now we think that there's a short related to the moisture in the basement. As a friend of mine so eloquently says, "Oy vey!"

But we're trucking on. Fred's dad has started stripping trim in the master and we'll move onto that room and keep going. I have days that I want to throw my hands up and quit, and then I have days that I just want to sit there and cry. Everyone keeps telling me it will be worth it when we're done. Lord, I hope so. I know that God doesn't give us more than we can handle, and I'm trying to hold onto that so I don't pull out my hair.

Friday, October 7, 2011

One step forward, four steps back

I thought we were finally starting to cruise through the work. It seemed like the contractors were on task, and then some of it stopped. The kitchen should be completed, but we've had to wait for the electrician and plumber, as well as the cabinet installers to finish the cabinets. The back splash is in though....

Primed bathroom- the blue is gone!!
I'll start from last weekend. We worked in the upstairs bathroom finishing scraping and prepping to prime. I told Fred and his dad that we had to stay until the room was primed. Thankfully, most of it was primed before we left Sunday. There are a few places we had to fill in that still needed to dry, but they'll be easy spot priming places. I got one side of the bathroom door primes and finished priming the shelves for the bathroom closet.

Red door!! :-)
While we were there, the crew showed up to start working on the outside. The fascia, trim and windows all need to be repainted. The windows also needed to be re-glazed. They also repainted all the exterior doors. We kept the same color except for the front door, which was painted a bold red. I love it! The trim and fascia were painted white. They used to be a beige color that just made the house look dingy. The white really makes the brickwork pop. We still need to take the protective film off the windows but it looks so much better. The crew also removed the rest of the shutters and we're going to go through them to find out which ones can be salvaged, repainted and rehung.
The trim painted white

There are a number of rooms in the house that the lights don't work for some reason and we've been begging to get the electrician there to finish.... he finally showed up and put up the light/fans for the living room and each of the bedrooms. He also managed to get the lights working in the basement again. Of course, he still has the rest of the kitchen to do to for all the appliances and a bunch of other tasks. I'll be glad when he's done so we can finally get the kitchen finished. Until then, we're still without power to the kitchen :-/

The plumber showed up this week and started getting the pipes in for the kitchen and installing the water heater and new sump pump, but we didn't realize that the water was off again until we arrived Wednesday ready to paint. We had planned it all out that we were going to go and finish spot priming the bathroom and prime the other side of the door and put a coat of white on the shelves. That didn't happen, since it's really difficult to paint when there's no water to the house, so once again we're way behind on what we need to do. Now we have to do that stuff Saturday and won't be able to paint the bathroom since we'll have to wait for the spot prime to dry.

I'll be so glad when the electrician, plumber, and kitchen guys are done and I won't have to wait on anyone else to get their mess together before we can finish what we need to do. Here's hoping that by the end of next week, we won't have to worry about anyone else and can get it there and work our butts off....

Thursday, September 29, 2011

The kitchen is the heart of the home


The kitchen is nearly complete! The cabinets and counter tops are in. When designing the kitchen, we asked a lot of people for advice on the colors to go with for cabinets, counters, walls and tile. We ended up deciding on a color called Cashmere for the cabinets and a dark granite counter that has some browns and tans in it.  Looking at it all together, I think it's tied together very nicely. It's very hard to imagine everything when you're choosing out of a showroom. You can see how the pieces match, but it's hard to know for sure that it will look good until everything is installed.

Fred went to the house after the cabinets and counters were installed and had kind of a freak out because the counters seemed different from the sample we picked. I tried to assure him that with granite, each piece was a little different. He was convinced it was black and pink, instead of black/brown. So he decided at 7:30 on Friday night that he wanted me to see it. I kept telling him that even if it was wrong, there's nothing that could be done until Monday and we'd be at the house anyway that weekend. He didn't care and off to the house we went. I was starting to get nervous that it was black and pink cause Fred kept freaking out, so when we got to the house I was hesitant to go in. When I walked into the kitchen and looked at the counter in the light, it looked fine. It looked black/brown. I explained to him that the difference is that the brown parts were bigger than what was on the sample, but it looked good. I think Fred saw the counter in the afternoon light and it looked more pink than brown. So all is well for that. Looking at the kitchen nearly complete, I'm so excited to finish everything and get moved in. It is exactly the kitchen I've dreamed of and will certainly be the heart of our home.

Upstairs bath tile- not yet grouted
We still have a lot to do though. We're still working on the upstairs bathroom. I hope to knock that out this weekend and hopefully the Master bedroom. If we can have a weekend where there isn't four million things going on, we may actually get some work done. The tile guys have put down all the tile in the bathrooms and laundry room, so those are almost ready to go!

Downstairs bath tile
The guys are supposed to come this weekend to do the outside. From what I hear a whole crew is coming and they're going to work Fri-Mon to get it all done. I'm hesitant to believe it will be completed that quickly. We're painting the outside trim white and some of the doors will be white and the front door will be red.

The electrician is also supposed to finish up this week, thankfully! We've had several issues lately with the breakers. I'm also hoping he'll get the track lighting in the kitchen up and the ceiling fans in the living room and bedrooms up. It would be nice to have overhead lights in those rooms- currently there is none. The best part is that the appliances are supposed to be delivered this weekend. Hopefully, the plumber will get out there soon to finish up his stuff, so we can get the dishwasher and faucet installed.

Laundry room tile
Our ETA is November. Hopefully before Thanksgiving, but we still have so much scraping, sanding, priming and painting to do, I'm just praying we're done by the end of the year. Looking around the house, I can see how far we've come. We're trying to keep the integrity of the house, but make it into the home it should be. The home was built with so much stability and character, that we would be doing it a great disservice to renovate instead of rehabilitate. We've been doing research on the house trying to find information on what the inside and outside looked like after it was built, because we want to restore the original charm. I hope we can accomplish the task.

Monday, September 19, 2011

Another weekend gone

New tile floor!
We have tile! And it looks good!   The cabinets are supposed to go in this week. The kitchen is getting closer to being finished. We're also getting closer to having all of the tile work in the house done. (Tile is being done in the downstairs bath, laundry room, and upstairs bathroom wall (around the shower)).

Fred and his parents worked hard on Saturday scraping the windows in the upstairs bath. I had my sisters in town, so I had the day off. We did go by to show see the house and say hello.  Sunday was a lot more productive.

Trim scraped to the wood
A friend of the family, who is a professional painter, came with us Sunday to help out. He gave us some great tips and helped a bunch scraping windows. He told about how a heat gun can melt the paint off of the trim to easily remove it. He even brought his over to show Fred how to use it. Fred is in love! He went and got one for himself and went to town on the trim in the upstairs bath. The heat gun gets up to 1000ยบ and melts the paint, so you can easily scrape strips off. It was able to get three layers of paint off and get it down to the wood! So after some sanding to make it smooth, we'll be ready to prime and paint the bathroom.... which we finally decided on the color- it's called Bee's Wax (yellow).

Sweeping up paint chips
I got started priming the shelves that go to the closets and linen closet.  One side of them is done and drying. We're estimating that the cabinets and maybe counters will be going in this week. I hope they do. Our task continues to be scraping and sanding, but we're getting closer. We now have 16 windows scraped! We're more than half way there! Of course we still need to sand, prime and paint 12 of them. I'm hoping we'll be able to get the upstairs bathroom completed this weekend and start on the bedrooms.

Thursday, September 8, 2011

Two rooms primed and painted.... eight more to go

How much can we get done in a three-day weekend?  A lot.

Most of Saturday was spent at Lowe's, where we bought the appliances, four ceiling fans, a mailbox and post, a new lock, and lots of other misc items. Let's just say that Lowe's loves us now. After scouring the internet for deals on appliances and reading reviews, we decided on the Frigidaire Gallery series and the Frigidaire Professional series. Due to a great Labor Day sale, we were able to get the appliances we wanted- Stainless Steel. We also went ahead and bought most of the paint and primer we need for the house.

When we finally got to the house, we decided to go ahead and finish cleaning up the yard from the hurricane, so the grass could be cut. Fred continued to get large limbs and I grabbed the smaller stuff. We had to get all the yard debris to the street since pick up was Tuesday (the 6th). They don't give much time. Fred also decided it was a good time to start cleaning out from under the trees of other fallen limbs that have been there a while, since it's "free." We were going to wait to do it but since the city is picking up debris, we figured we should go ahead and get as much done as possible, so we don't have to pay for bulk removal later. A lot of the baby pines were pulled up, but there is still plenty if any one wants some pines or magnolia seedlings. We have plenty to spare, just let us know.

Painted kitchen- color is called Canoe
Sunday... fun day. The day to paint. Since the tile is being put down this week, we want as much paint up as possible in the rooms needing tile. Fred and his dad started cleaning up in the kitchen. They pulled the rest of the linoleum floor up and took apart the refrigerator that was already at the house and put it in the basement. This gave an open room, with no obstacles. My mom and her friend came to help us and we promptly put paint brushes in their hands. My mom primed the trim in the stairwell, while her friend worked on painting the ceiling in the kitchen. I was busy in the pink bathroom, scraping and sanding. I was determined to get that room primed that day. Fred worked on scraping the window in the bathroom and while I wanted on him, I primed more door frames in the kitchen... there are five door frames that connect to the kitchen.  Once Fred was finished, I went to town priming the bathroom. Finally, some of the pink would be gone! We still have the pink tile, but it felt so good covering up the pink trim. Of course I ended up wearing as much paint as I got on the wall. Fred's dad is far more patient and steady than I am, so he painted all the trim to the windows in the kitchen and bathroom, making them look almost new! Sunday was a very late night trying to get stuff done, but ended up being very productive... the kitchen and bathroom were ready for paint.

Labor Day was certainly that.... a day of hard labor. The day had finally arrived that we could get some color on the walls. While Fred and his dad started painting in the kitchen, I went and painted the trim in the bathroom. I think I may need a second coat to hide the pink. The primer and one coat may not be enough. A little pink keeps coming through :-/ But, it is a big improvement. When I got to the kitchen, the wall painting was under way and looking good. I really like the color. At first I was afraid it was too dark, but I think the light-colored cabinets will brighten it up. I worked on painting the trim on the door frames I had primed the day before. Finally, the kitchen is primed, painted and trimed, and ready for tile!!

Design/layout

We didn't get many pictures cause we forgot the camera, but I snapped a couple with my phone. The latest is that the subfloor in the kitchen has to be replaced before they can tile, but tile is still supposed to start this week. The cabinets are ready and should be installed next week, so, I think we can reveal the design and hope that nothing happens....

Design/layout
Fred and his dad also put up the mailbox and post and then continued to clean up in the yard, cutting dead limbs and cleaning up debris. It's finally starting to look like a kept yard- sort of. I stayed busy working on the other bathroom, scraping the trim and walls. There's still a lot to do in that bathroom, but hopefully it won't take too long. It was a very productive three-day weekend, although I think I need a week to really make a dent in the to-do list and then another week to recover.
Design/layout